Building Regulations‚Äč

We will draw up detailed plans and sections and obtain supporting information for the proposed scheme ready for submission to the Local Authority Building Control Department, they will check the drawings and details and following any necessary consultations and liaisons with us and/or your builder, a Building Regulations approval will be issued. Our drawings show how the proposed works will comply with those standards as set out in the Approved Documents


The Local Authority Building Control Inspectorate will liaise with your builder and inspect the work as it progresses on site. 

When the project is completed to a satisfactorily standard, a Building Regulations Completion Certificate will be issued showing that the project has been independently inspected and that it complies with the current Building Regulations.


All work must comply with the Building Regulations and the technical design and constructional requirements of the current Approved Documents A to P and Regulation 7 - Materials and Workmanship.


Click Here to Add a Title

Click this text to start editing. This block is great for showcasing a particular feature or aspect of your business. It could be a signature product, an image of your entire staff, an image or your physical location, etc. Double click the image to customize it.